Please use this identifier to cite or link to this item: http://repository.eia.edu.co/handle/11190/2346
Title: Estrategias para implementar un modelo de logística inversa en las actividades de mampostería de una edificación en altura
Authors: Gutiérrez Olarte, Martín
Trujillo Montoya, Valentina
Adviser: Sierra Suárez, Jorge Enrique
Keywords : PMA
RCD
Rendimiento
Logística inversa
Mampostería
EMP
DCW
Performance
Reverse logistics
Masonry
Issue Date: 2019
Publisher: Universidad EIA
Abstract: Hace algún tiempo, se pensaba que la región era ajena a los cambios climáticos y a las consecuencias del calentamiento global, hecho que desgraciadamente ha vivenciado el país en los últimos años, dado que la construcción aporta un 39% de emisiones de GEI, ha sido necesario comenzar a darle un vuelco al sector hacia métodos constructivos más “verdes”. Aunque suene sencillo, debido a los rezagos tecnológicos de la construcción, la implementación de técnicas constructivas en mampostería no estructural que lleven a la reducción del consumo de materiales contaminantes y de residuos (RCD), no lo es, así es que en este estudio, se decidió hacer una combinación de ambas cosas de manera sencilla y llevando a cabo pequeños cambios en algunos puntos críticos de la cadena logística, como lo son el acopio de material, el transporte en obra, el aumento del rendimiento y la correcta separación y disposición de los residuos. Tomando como referencia 3 obras de edificaciones en altura, teniendo en cuenta la Resolución 0472 de 2017, que reglamenta la correcta disposición de RCD a través de un plan de manejo ambiental (PMA), se realizó una caracterización teórico-práctica de las actividades concernientes a la mampostería para obtener un espectro general de las mismas y así comparar y conocer que tipos de actividades pueden ser objeto de cambio, en aras de aumentar el rendimiento y la efectiva recolección, disposición y disminución de residuos. A través de esta caracterización, junto con estudios realizados previamente, se decidió realizar mediciones en obra de las siguientes actividades constructivas: colocación de primera hilada, instalación de muros divisorios (particiones) e instalación de bloques para fachada, estos datos fueron obtenidos y posteriormente analizados y comparados para determinar si eran fiables y por qué las variaciones entre ellos. Finalmente, se realizó un análisis del modelo de logística inversa actual presente en las obras y como a través de nuevas prácticas se podría obtener un mayor aprovechamiento de los residuos y consecuente a esto generar disminuciones en los costos referentes a la disposición de los residuos en las obras.
Abstract (English): A while ago, it was thought that the effects and consequences of climate change and global warming wouldn´t affect the region, a fact that the country had to live up to in recent years. Taking into account that the construction industry accounts for 39% of the CO2 thrown into the atmosphere, it has become a necessity to give the industry a turn-around towards “greener” constructive methods. Even though it sounds easy, due to technological lags in construction, the implementation of non structural masonry constructive techniques which aims to reduce the construction and demolition wastes (CDW), it isn´t, so this article aims towards easing a combination of both in a simple, step-oriented way in which the most influential activities are tweaked to achieve a reduction in wastes and an improvement in performance. Taking as reference 3 different construction buildings and the Resolution 0472 of 2017, which states the correct treatment and disposal of CDW through an environmental management plan (EMP), a theoretical-practical characterization of the masonry oriented activities was made so a broad spectrum of how most activities are done could be obtained and in that way, eventually they could be compared between each other and then get to know those activities that could be potentially changed in a context of more performance and less wastes. By means of this characterization, joint with previous studies around the subject, it was decided to conduct a series of measurements of the most time-crucial constructive activities, those are: the installation of the first course, the installation of partition walls and the installation of the facade, this data was obtained and subsequently analyzed and compared to determine if those measurements were reliable and the reasons between their differences. Finally, an analysis of how those constructions utilized a reverse logistics model, and then, through new practices, they could get a major harnessing of those wastes and eventually, by consequence, lower their waste generation and disposal costs.
Description: 96 páginas
URI: http://repository.eia.edu.co/handle/11190/2346
Citation: Álvarez, M. (2019). Estrategias para implementar un modelo de logística inversa en las actividades de mampostería de una edificación en altura (Trabajo de grado). Recuperado de: http://repository.eia.edu.co/handle/11190/2346
Location: CIVI0532
Appears in Collections:Ingeniería Civil

Files in This Item:
File Description SizeFormat 
GutierrezMartin_2019_EstrategiaImplementarModelo.pdfTrabajo de grado3.1 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.