Publication: Calidad de la estructuración en los proyectos viales de la gobernación de Antioquia
Thumbnail
Bibliographic citations
QR code
Advisor
Corporate Author
Data Collector
Others / Unknown
Audiovisual Director
Editor / Compiler
Publisher
Resource Type
Date
Citation
Series / Report / Volume / Collection Title
It Is Part Of
Abstract in english
The differences between the planned work and the executed work on highway projects are given because of inadequate quality of the structuring of the same (Cámara Colombiana de la Infraestructura, 2010b), which makes it generates additional work and extra work that had not been planned from the start, leading to turn to that present a time lag of projects. Due to the wide recurrence of this phenomenon in the country and the importance given to the Departamento de Antioquia road infrastructure, it identifies the need for a study of road projects of the Department, taking fifteen contracts vials culminated in the Gobernación de Antioquia.
Abstract in spanish
Las diferencias entre la obra planeada y la obra ejecutada en los proyectos viales se deben a una inadecuada calidad de la estructuración de los mismos (Cámara Colombiana de la Infraestructura, 2010b) , lo cual hace que se generan obras adicionales y obras extras que no habían sido previstas desde un inicio, conllevando a su vez a que se presente un desfase presupuestal de los proyectos. Por la amplia recurrencia de este fenómeno en el país y debido a la importancia que le da el Departamento de Antioquia a su infraestructura vial, se identifica la necesidad de realizar un estudio de los proyectos viales del Departamento, tomando quince contratos viales culminados de la Gobernación de Antioquia.